Written By: Eric J. Conn
OSHA is signaling a major departure from its position on acceptable exceptions to the Lockout/Tagout requirements in the agency’s electrical safety standards. Historically, employers have been permitted to conduct electrical maintenance near energized parts in data centers that host critical business operations (i.e., operations which must stay live 24/7), under an “infeasibility” exception to the general rule that electrical equipment must be deenergized and locked out before maintenance is permitted. A series of recent enforcement ...
By Eric J. Conn, Head of the OSHA Group at Epstein Becker & Green
OSHA is signaling a major departure from its position on acceptable exceptions to the Lockout/Tagout requirements in the agency’s electrical safety standards. Historically, employers have been permitted to conduct electrical maintenance near energized parts in data centers that host critical business operations (i.e., operations which must stay live 24/7), under an “infeasibility” exception to the general rule that electrical equipment must be deenergized and locked out before maintenance is permitted. ...
Recent Updates
- Menopause as a Protected Class: Growing Trend or a Hot Flash?
- The Second Circuit Joins Fellow Circuits in Extending Limitations on Mandatory Arbitration Agreements
- Updating Your First Aid Kit: What Employers Need to Know About Opioid Antagonist Requirements in New York
- New DOL Guidance Reiterates Key Priorities for MHPAEA Enforcement - Takeaways for Plan Sponsors
- Shh! Press the Button: New York State DOL Proposes Silent Response Button Rules for Retail Workplace Violence Prevention